Shanghai&32;Boiler&32;Works&32;Co&32;Ltd.-
Jingneng&32;Shiyan&32;2×350MW&32;Supercritical&32;Two-pass&32;Boiler
The power plant is located in Zhangwan District, Shiyan City, Hubei Province. The Project adopts two 350MW Supercritical Two-pass Boilers. Unit1 has been put into production on December 22,2018. Unit 2 will be put into production in February, 2019.

The company has started digestion and absorption of introduced supercritical technology since 2003. Then conducted self-development, technology optimization and undertook lots of supercritical boiler orders. The operation performance is in a leading position in China.

(1) Two-pass arrangement with better safety, reliability, and lower electricity consumption.

(2) Advanced compound air classification low NOx tangential combustion system, high-efficient, environment friendly, with wider coal adaptability.

(3) Reasonable heating surface arrangement and temperature regulation mode with better regulation of steam temperature.

Contact Us
Shanghai&32;Boiler&32;Works&32;Co&32;Ltd.
Address:No.250&32;Huaning&32;Road,&32;Shanghai,&32;PRC
Post code:200245
Tel: +86(21)6430&32;2391
Fax:+86(21)6430&32;1980